General of Huzhou | Administration division | Development zones | Investment Guide | Characteristic industry | link |
Encourage the investment field | Policy&law | Project that promote trade and investment | Project recommend
 
¡¡General Situation
¡¡Infrastructure
¡¡Advantage Resource
¡¡Econmic Development
¡¡Opening to the Outside World

Easy Access

¡¡¡¡Huzhou enjoys easy access. It is only one hour's drive from Huzhou to Xiaoshan International Airport in hangzhou by expressway. The hangzhou-Huzhou-Nanjing Expressway that has been completed and Shanghai-Jiangsu-Zhejiang Huzhou-Anhui Expressway and Shanghai¡ªJiaxing¡ªHuzhou Expressway under construction links Huzhou with the state high-speed highway network. Visitors can only take an hour to drive from Shanghai to Huzhou. Besides, the No. 104 state highway and the No. 318 state highway pass through Huzhou city. The three railways through Huzhou, they are, Anhui-Huzhou-hangzhou, Xinyi Jiangsu-Changxing Huzhou, Huzhou-Zhapu Port have connected with the state trunk railways ¨C Longhai Railway and Huhang Railway. The canal from Changxing to Shanghai renown as the Oriental Rhine also offers Huzhou a convenient water transportation mean. Huzhou also boasts its state first class inland transfer facility for railway, highway and waterway transport and international transportation base for containers.

Telecommunications

¡¡¡¡There are 1041800 existing desk phones with the popularity rate of 92.4% per 100 people,1334100 mobile phones and 157900 internet subscribers.

Energy

¡¡¡¡The installed capacity of electric power is 3.258 million kw, among which Tianhuangping Pumped Storage Power Plant alone has an installed capacity of 1.8 million KW, the largest in Asia and the second largest in the world.

¡¡¡¡Huzhou has attached importance to both the construction of power plants and power networks. A series of major energy projects have been completed successfully, they are, Tianhuangping Pumped Storage Power Plant Phase II, Changxing Power Plant Phase II, Changguang Power Plant Phase III, Changxing Huaneng Power Plant Expansion Project, Zhejiang Huihai Water Coal Slurry Power Plant, 220KV Power Transmission and Transformation Projects in Wukang, Donglin, Meixi and Lvshan, 500 KV and 110 KV Power Transformation Projects, the urban natural gas supply and thermal power plants etc. The quality and reliability of power supply in the city have been improved continuously.

Education

¡¡¡¡3 Full-time colleges with 14300 undergratuates; 27 full-time vocational schools with 39900 students. 26 high schools; 5 adult training schools.

 

Huzhou Foreign Trade And Economic Cooperation Bureau